NVIDIA HGX B300 in Australian stock · GB300 NVL72 halls in design

Australian AI infrastructure, built from the grid to the GPU.

QORINAI develops, builds and operates AI data centres — land and power, design and construction, hardware, cluster deployment, 24×7 GPU operations and a sovereign cloud on top. Every link of the chain, one accountable team.

26 MW+delivered by our delivery partners
150 kWper rack, liquid-cooled design
GW-classcampus in masterplanning
100 %Australian owned & operated
SCROLL

Why QORINAI

Australia has no shortage of planned data centres. It has a shortage of energisable land, liquid-cooled halls and people who can run a GPU fleet. So we built a company around all three.

  • POWER FIRSTThe connection before the concrete

    Transmission and distribution enquiries, system-strength studies and three supply layers — grid, interim distribution, on-site generation — before a hall is designed.

  • DENSITY BY DESIGN150 kW liquid-cooled racks from day one

    Direct-to-chip cooling, rear-door heat exchange and air halls in every campus, so the next NVIDIA or AMD generation is a rack swap, not a rebuild.

  • OWNER-MANAGEDNo master EPC in the middle

    Electrical, mechanical, liquid-cooling and compliance trades engaged directly. The margin and the know-how stay with the project.

  • SOVEREIGNAustralian owned, staffed and hosted

    No prompt caching, no training on your data, no offshore approval between you and your hardware.

  • SUPPLY CERTAINTYA manufacturer on the share register

    Hyperscalers, Australia's open-OEM manufacturer, is our strategic shareholder — local stock, Australian warranty, lab test drives.

  • ONE OPERATORThe team that designed the loop answers the 2 a.m. alert

    One contract, one SLA, one phone number from build through operations.

Track record

Delivered by the people who now deliver for QORINAI.

Partner-delivered projects

Our delivery partners and engineering leads have built and operated high-density compute in Australia since 2008 — modular sites beside power stations, inner-city colocation, liquid-cooled GPU clusters and a ~14 MW high-density build.

Largest single build~14 MWhigh-density compute, direct utility coordination
Modular delivery8 × 2.5 MWtransportable modules beside a renewable power station
Staged energisation1.9 → 20 MWcontracted in three stages over five months
Continuous operations18 yrsinner-city colocation, N+1, opened 2008

Strategic shareholder

Backed by Australia's open-OEM server manufacturer.

Where we are

Melbourne-led, national by design.

Head office · Victoria

Melbourne

Headquarters, engineering and the flagship gigawatt-class campus programme in the state's north.

Delivery partners · NSW

Sydney

Partner-delivered high-density, modular and liquid-cooled projects across Greater Sydney and regional NSW.

Hardware & lab · ACT

Canberra

Hyperscalers' manufacturing, local stock and HyperLabs test-drive facility.

Tell us about the megawatts and the models.

Land and a grid connection, a fleet of GPUs with nowhere to go, or a model with no compute — an engineer replies within one business day.

Contact us